How ACI 318-19 sets development and lap lengths
A reinforcing bar can only reach its yield strength if it is embedded far enough for bond with the concrete to transfer that force. That embedment is the development length. Where two bars are lapped, the splice has to pass the same force from one bar to the other through the surrounding concrete, so lap lengths are built from the development length. This calculator follows ACI 318-19 in US customary units (psi and inches) and works internally in those units even when you enter MPa and millimetres.
Tension development, general equation (25.4.2.4)
ld = (3/40) × fy ÷ (λ√f′c) × ψtψeψsψg ÷ ((cb + Ktr) ÷ db) × db, and not less than 12 in
Ktr = 40Atr ÷ (s × n), with (cb + Ktr) ÷ db not more than 2.5
fy is the specified yield strength and f′c the specified concrete strength, both in psi; √f′c is not taken above 100 psi (25.4.1.4). db is the nominal bar diameter. cb is the smaller of the cover to the bar centre and half the centre-to-centre bar spacing. Atr is the area of transverse reinforcement within spacing s that crosses the potential splitting plane, and n is the number of bars being developed or spliced along that plane. Setting Ktr = 0 is always allowed and is conservative.
The modification factors are: λ = 1.0 for normalweight and 0.75 for lightweight concrete; ψt = 1.3 where more than 12 in of fresh concrete is placed below the bar, otherwise 1.0; ψe = 1.5 for epoxy-coated or zinc-and-epoxy dual-coated bars with clear cover under 3db or clear spacing under 6db, 1.2 for other epoxy-coated bars and 1.0 for uncoated or galvanised bars; the product ψtψe need not exceed 1.7; ψs = 0.8 for No. 6 and smaller bars and 1.0 for No. 7 and larger; ψg = 1.0 for Grade 40 and 60, 1.15 for Grade 80 and 1.3 for Grade 100 steel.
Tension development, simplified equations (25.4.2.3)
Case 1, No. 6 and smaller: ld = fyψtψeψg ÷ (25λ√f′c) × db; No. 7 and larger: ÷ (20λ√f′c)
Other cases, No. 6 and smaller: ld = 3fyψtψeψg ÷ (50λ√f′c) × db; No. 7 and larger: ÷ (40λ√f′c)
Case 1 applies when the clear spacing is at least db, the clear cover at least db and at least the code-minimum stirrups or ties run along ld, or when the clear spacing is at least 2db and the clear cover at least db. The bar-size split replaces ψs, and the 12 in minimum still applies.
Lap splices and compression
Tension lap (25.5.2): Class A = 1.0 ld, Class B = 1.3 ld, each at least 12 in
Compression development (25.4.9): ldc = the greater of 0.02fyψr ÷ (λ√f′c) × db and 0.0003fyψr × db, at least 8 in
Compression lap (25.5.5): 0.0005fydb for fy ≤ 60,000 psi, or (0.0009fy − 24)db above that, at least 12 in, and one third longer when f′c is below 3,000 psi
A Class A splice is allowed only where the area of steel provided is at least twice the area required by analysis over the whole splice and no more than 50% of the bars are spliced within the lap length. Every other tension splice is Class B, which is why the headline result is Class B. For the splices, ld is taken before its own 12 in minimum is applied. ψr is 0.75 for a compression bar enclosed by confining reinforcement as defined in 25.4.9.3, otherwise 1.0.
Worked example: a #6 bottom bar
A #6 uncoated bottom bar (db = 0.75 in) of Grade 60 steel (fy = 60,000 psi) in 4,000 psi normalweight concrete, with cb = 2.0 in and Ktr taken as 0. These are the calculator's defaults.
- √f′c. √4,000 = 63.25 psi, under the 100 psi cap.
- Factors. λ = 1.0, ψt = 1.0, ψe = 1.0, ψs = 0.8 (No. 6), ψg = 1.0 (Grade 60). Their product is 0.8.
- Confinement term. (2.0 + 0) ÷ 0.75 = 2.667, which exceeds the limit, so 2.5 is used.
- Development length. 0.075 × 60,000 ÷ 63.25 = 71.15; × 0.8 ÷ 2.5 = 22.77; × 0.75 in = 17.08 in. That is above 12 in, so ld = 17.08 in, or 22.77 bar diameters.
- Tension laps. Class A = 17.08 in. Class B = 1.3 × 17.08 = 22.20 in, or 29.60 bar diameters.
- Compression development. 0.02 × 60,000 ÷ 63.25 = 18.97 and 0.0003 × 60,000 = 18, so 18.97 governs: 18.97 × 0.75 = 14.23 in.
- Compression lap. 0.0005 × 60,000 × 0.75 = 22.5 in, or 30 bar diameters.
Switching the same bar to the simplified method, Case 1, gives 60,000 ÷ (25 × 63.25) × 0.75 = 28.46 in. The general equation came out 40% shorter here because it credits the 2.0 in of cover, which the simplified table does not.
Reading the result
The general equation usually pays off. The simplified equations assume modest confinement. When cb reaches 2.5db the general equation reaches its shortest length, and stirrups counted through Ktr can get you there with less cover.
Top bars and epoxy add up fast. A top bar that is also epoxy-coated with small cover would carry 1.3 × 1.5 = 1.95, but the product is capped at 1.7. Slab top mats and beam top steel are where this matters.
Metric entry. MPa and millimetres are converted with 1 MPa = 145.0377 psi and 1 in = 25.4 mm before the US equations are applied. The minimum lengths are then exactly 12 in (304.8 mm) and 8 in (203.2 mm), a touch longer than the rounded values in ACI 318M. In metric mode ψs = 0.8 applies to bars of 19.1 mm diameter or less, and the grade steps for ψg and the compression lap are taken at 420 and 550 MPa, the metric Grades 420 and 550. If you design to ACI 318M, check its own coefficients.
What is not covered. Hooked bars, headed bars, bundled bars and the reduction of ld for excess reinforcement are outside this calculator, as are mechanical and welded splices. ACI 318-19 also places further detailing conditions on high-strength bars; check them in the code. The code edition named in your project specification governs, and the structural engineer of record sets the final lengths.