How the formwork area is worked out
Formwork is measured by contact area: the surface of form face that touches wet concrete. It is the figure plywood, labour rates and form hire are priced on. Each element has its own formula, with all dimensions in metres.
Slab: A = L × W + 2(L + W) × t
L and W are the plan length and width and t the slab thickness. L × W is the soffit, the underside the slab sits on; 2(L + W) × t is the edge form around the perimeter.
Beam: A = b × L + 2 × (h − ts) × L
b is the beam width, h the overall depth including the slab, ts the slab thickness and L the span. The sides only run down from the underside of the slab, because the slab soffit forms close against them. If h is less than ts, the side depth is taken as zero.
Square or rectangular column: A = 2(a + b) × H Round column: A = π × d × H
Wall: A = 2 × L × H + 2 × t × H (leave out the second term without stop-ends)
Sheets to buy = A × (1 + waste % ÷ 100) ÷ sheet area, rounded up. A 2.4 × 1.2 m sheet covers 2.88 m².
How the props are checked
q = γ × t + gf + Q, but not less than 4.8 kPa
γ is the unit weight of reinforced concrete (25 kN/m³ by default), t the thickness of concrete above the prop, gf the self-weight of the formwork (0.5 kPa) and Q the construction live load for workers, equipment and heaped concrete. ACI 347, the American Concrete Institute guide to formwork, recommends a live load of at least 50 psf, about 2.4 kPa, and a combined dead plus live design load of at least 100 psf, about 4.8 kPa. With the default values the 4.8 kPa floor only governs for slabs thinner than (4.8 − 2.9) ÷ 25 = 0.076 m, so a 75 mm slab gives 4.775 kPa and is designed for 4.8 kPa.
nx = ⌈L ÷ sx,max⌉, ny = ⌈W ÷ sy,max⌉, P = q × (L ÷ nx) × (W ÷ ny)
Props sit at the centres of an nx × ny grid, so each takes an equal tributary area and the outer row is half a spacing from the edge. P is the load per prop and the utilisation is P divided by the prop's safe working load. The largest square spacing the prop can carry is √(safe load ÷ q). For a beam, the tributary width is the beam width plus any slab width the beam props carry; the beam part uses the overall depth and the slab part the slab thickness, and their average pressure is spread across the rows.
Worked example: a 5 m × 4 m × 200 mm slab
- Soffit. 5 × 4 = 20 m².
- Edges. The perimeter is 2 × (5 + 4) = 18 m, so 18 × 0.2 = 3.6 m².
- Total contact area. 20 + 3.6 = 23.6 m².
- Sheets. 23.6 × 1.10 = 25.96 m², and 25.96 ÷ 2.88 = 9.01, so 10 sheets.
- Design pressure. 25 × 0.2 + 0.5 + 2.4 = 5 + 2.9 = 7.9 kPa, above the 4.8 kPa minimum.
- Prop grid. 5 ÷ 1.2 = 4.17, so 5 props along; 4 ÷ 1.2 = 3.33, so 4 across: 20 props at 1.0 m × 1.0 m.
- Load per prop. 7.9 × 1.0 × 1.0 = 7.9 kN, which is 39.5% of the 20 kN example rating. As a check, 20 props × 7.9 kN = 158 kN = 7.9 kPa × 20 m².
- Spacing limit. √(20 ÷ 7.9) = 1.59 m, so a square grid up to 1.59 m would still be within the example rating, if the bearers and plywood span that far.
For a 6 m beam 300 mm wide and 600 mm deep under the same 200 mm slab, the bottom is 0.3 × 6 = 1.8 m² and the sides 2 × 0.4 × 6 = 4.8 m², 6.6 m² in all. The pressure is 25 × 0.6 + 2.9 = 17.9 kPa, or 0.3 × 17.9 = 5.37 kN per metre. A single row of 5 props at 1.2 m carries 5.37 × 1.2 = 6.44 kN each, 32.2% of 20 kN, and the row could open out to 20 ÷ 5.37 = 3.72 m before the prop rating is reached. Other figures check the same way: a 6 m × 2.7 m wall 200 mm thick has 2 × 6 × 2.7 = 32.4 m² of faces and 2 × 0.2 × 2.7 = 1.08 m² of ends, 33.48 m² in total; a 400 mm square column 3 m tall has 1.6 × 3 = 4.8 m²; and a 400 mm round column 3 m tall has π × 0.4 × 3 = 3.77 m².
What this does not cover
Lateral pressure. Wet concrete pushes sideways on wall and column forms, and that pressure is what sizes ties, walers and column clamps. It depends on pour rate, temperature and the mix, and is calculated with the ACI 347 or CIRIA method. It is not covered here.
The props are only one link. A prop that passes on load can still fail if it is not braced, stands on soft ground or a slab that cannot take it, or is extended beyond the height its rating applies to. Bearers, joists and plywood all have their own span limits, often tighter than the prop's, and the spacing you enter should come from them.
Stripping and reshoring. When forms can come off and how floors below are back-propped depend on concrete strength and the loads above. Those decisions belong to the engineer.
Temporary works must be designed. Formwork collapses are among the most serious incidents on a building site. Use these numbers for quantities and a first check of a layout, and have the falsework designed and inspected by a competent person before any concrete is placed.