Gravel, Crushed Stone and Sand Calculator

Work out how much gravel, crushed rock, road base, sand or scoria to order for a path, driveway, pad or base. Enter the area and the finished (compacted) depth; a compaction factor turns that into the loose volume to order, and a bulk density turns the loose volume into tonnes and US short tons.

Last updated .

The area to cover

Shape
Units
m
m
mm
×

Loose volume to order = compacted volume × factor. 1.2 means 20% more loose material than the finished volume, a typical figure for road base or crushed rock that is rolled or plate-compacted. Enter 1 for gravel that is only spread and raked. Ask your supplier for their figure; see compaction.

t/m³

Choosing a material fills in a typical loose density. Real figures vary with the rock, the grading and the moisture, so replace it with the figure your supplier uses. Typical loose figures used here:

    Result

    To orderAmount

    The weight depends entirely on the density and compaction factor you enter. Suppliers sell by the tonne or by the cubic metre (or by the ton or cubic yard), so check which one a price is for.

    Show the working

      From area and depth to tonnes

      Gravel, crushed stone and sand are measured by volume but usually sold by weight, so the calculation has three steps: the finished volume of the layer, the larger loose volume needed to build it, and the weight of that loose volume from the material's bulk density. Bulk density is the weight of one cubic metre of the material as delivered, air gaps between the stones included.

      Compacted volume Vc = A × d

      A is the area in square metres: length × width for a path, pad or driveway, or π × D² ÷ 4 for a circle of diameter D. d is the finished depth in metres, so a depth in millimetres is divided by 1,000.

      Loose volume to order VL = Vc × k

      k is the compaction factor: how many cubic metres of loose material it takes to make one cubic metre of compacted layer. A factor of 1.2 is the same as a 20% allowance. It is 1 if the material is simply spread.

      Weight = VL × ρ

      ρ (rho) is the loose bulk density in tonnes per cubic metre. One tonne is 1,000 kg. A US short ton is exactly 2,000 lb, or 907.18474 kg, so one tonne is about 1.1023 short tons, and 1 t/m³ is about 0.8428 short tons per cubic yard. In imperial mode the volume is in cubic yards and the density in short tons per cubic yard.

      Typical loose densities

      The presets are typical figures for dry, loose material, chosen as a starting point. Every one is editable, and the figure your supplier uses to convert between tonnes and cubic metres should replace it.

      MaterialTypical loose density
      Gravel1.6 t/m³ (1.35 tons/yd³)
      Crushed rock1.5 t/m³ (1.26 tons/yd³)
      Road base1.7 t/m³ (1.43 tons/yd³)
      Sand, dry1.6 t/m³ (1.35 tons/yd³)
      Scoria0.9 t/m³ (0.76 tons/yd³)

      Scoria is a porous volcanic rock, so it weighs a little over half as much as gravel for the same volume. Damp sand is heavier than dry sand, and a well-graded mix of sizes packs more tightly than single-size stones because the small pieces fill the gaps.

      Worked example: a road base driveway

      1. Area. A driveway 10 m long and 3 m wide is 30 m².
      2. Depth. 100 mm ÷ 1,000 = 0.1 m finished.
      3. Compacted volume. 30 × 0.1 = 3 m³.
      4. Loose volume. With a compaction factor of 1.2, 3 × 1.2 = 3.6 m³ to order.
      5. Weight. At 1.6 t/m³, 3.6 × 1.6 = 5.76 tonnes, which is 5.76 × 1,000 ÷ 907.18474 = 6.35 US short tons.

      That is 5.76 ÷ 30 = 0.192 tonnes, or 192 kg, for every square metre. Without compaction the same driveway would need 3 m³, or 4.8 tonnes. A circle of decorative gravel 3 m across under a fire pit, 50 mm deep and only raked (factor 1), is 3.1416 × 9 ÷ 4 × 0.05 = 0.3534 m³, or 0.565 tonnes.

      In imperial units, a path 30 ft long, 4 ft wide and 4 in deep is 30 × 4 × 0.3333 = 40 cubic feet, which is 40 ÷ 27 = 1.481 cubic yards compacted. With a factor of 1.2 that becomes 1.778 cubic yards loose. A density of 1.6 t/m³ is 1.35 short tons per cubic yard, so the path needs about 2.4 short tons.

      Compaction

      A layer of crushed rock or road base that is rolled or plate-compacted ends up denser and thinner than when it was spread. To finish at the depth you want, you need more loose material than the finished volume. How much more depends on the material, its grading and moisture and the compaction effort, which is why the factor is an input: 1.2 is a typical starting figure, not a property of any product. Decorative gravel that is only raked level needs a factor of 1 or close to it. If you know the compacted density of the material, you can enter that density with a factor of 1 and get the same weight, because the loose weight and the compacted weight of the same material are equal.

      Common mistakes

      Using millimetres as metres. 30 × 100 = 3,000 is not a volume; the depth must be 0.1 m.

      Applying the factor twice. If you enter a compacted density, set the factor to 1. Using a compacted density and a factor of 1.2 overstates the weight by 20%.

      Mixing up tonnes and US tons. A tonne (metric ton) is 1,000 kg; a US short ton is about 907 kg. The 5.76 tonnes in the example is 6.35 short tons, not 5.76.

      Forgetting the sub-base. A driveway usually has a coarser base layer under a finer top layer. Calculate each layer separately with its own depth, density and factor.