Slope, Grade and Elevation Calculator

Enter a horizontal run and the rise or fall over it, or the run and a target grade, to get the grade as a percentage, the 1 in X ratio, the angle and the length along the slope. A table then gives the level at every station from your starting elevation, ready for setting out a driveway, path, drain or pad.

Last updated .

What do you know?

Work from
m

Measured level, on plan, not along the ground.

m

End level minus start level. Use a minus sign for a fall, for example −0.32.

m
m

100.000 is an arbitrary datum. Enter the reduced level of your starting point, or leave it blank to list levels relative to zero.

Result

MeasureValue

Levels at each station

Chainage (m)Elevation (m)Change from start (m)

Chainage is horizontal distance from the start. Levels assume one straight, even grade; they are a setting-out guide, not a survey or a drainage design.

Show the working

    Grade, ratio and angle from rise and run

    Every way of describing a slope compares the same two lengths: the run, measured horizontally on plan, and the rise, the change in level over that run. A fall is simply a negative rise.

    Grade (%) = rise ÷ run × 100

    Ratio 1 : X, where X = run ÷ |rise|

    Angle θ = arctan(rise ÷ run)

    Slope length = √(run² + rise²)

    The grade is the rise per 100 units of run. The ratio, also written "1 in X", says how many units of run it takes to gain or lose one unit of height, so a larger X means a gentler slope; the vertical bars mean the sign is dropped, because the ratio says nothing about direction. The angle is measured from the horizontal. The slope length is the hypotenuse of the right triangle formed by the run and the rise, which is what you measure with a tape laid on the finished surface. Working from a target grade instead, the rise is run × grade ÷ 100 and everything else follows.

    Elevation at chainage c = start elevation + rise × c ÷ run

    Chainage is the horizontal distance from the start point. Stations are listed at every whole interval and at the end, even when the run is not an exact multiple of the interval.

    Worked example: a driveway rising 1.5 m in 25 m

    1. Grade. 1.5 ÷ 25 = 0.06, so 6%.
    2. Ratio. 25 ÷ 1.5 = 16.667, so 1 : 16.67 (about 1 in 17).
    3. Angle. arctan(0.06) = 3.434°.
    4. Slope length. √(25² + 1.5²) = √(625 + 2.25) = √627.25 = 25.045 m, only 45 mm more than the run.
    5. Levels. Each 5 m station rises 0.06 × 5 = 0.3 m, so from a start level of 100.000 the stations read 100.000, 100.300, 100.600, 100.900, 101.200 and 101.500 at the 25 m end.

    Working the other way, a stormwater pipe laid 32 m at a fall of 1% drops 32 × 1 ÷ 100 = 0.32 m. That is a ratio of 1 : 100 and an angle of −0.573°. With a 5 m interval the last whole station is at 30 m, level 99.700, and the end at 32 m is listed as well, at 99.680.

    Reading the result

    Percent grade is not degrees. This is the most common mistake. A 10% grade is 5.711°, not 10°, and a 100% grade, where the rise equals the run, is 45° and 1 : 1. Above about 10% the two scales drift apart quickly, so always say which one you mean.

    Check which way the ratio is written. This page gives vertical to horizontal, 1 : X, the usual way to state the fall of pipes, paths and ramps. Earthworks batters are often written the other way round as horizontal to vertical, so a "2 : 1 batter" usually means 2 m across for every 1 m up, which is a grade of 50%. Confirm the convention on the drawing before you set out.

    Run versus slope length. Plans, chainages and grades all use horizontal distance. On gentle slopes the difference hardly matters: at 10% the slope length is only 0.499% longer than the run. On steep ground it does: at 45% it is 9.66% longer, so measuring along the ground and treating it as run will understate the grade.

    One straight grade only. Real driveways usually need transitions at the top and bottom so cars do not scrape, and drains may change grade between pits. Treat each straight section as its own run and chain the start level of one from the end level of the last. Regulations and standards set maximum gradients for ramps, driveways and pipes; check the limits that apply to your job rather than relying on a general figure.

    Levels. The start elevation can be a true reduced level from a survey or any convenient datum, such as a peg called 100.000. Only the differences matter for the grade.